Quality and inspection

Traceability and recalls.

A recall is decided by what you can prove about which goods are affected. Without batch identity that runs from the Indonesian production record to your own customer, the answer is everything you ever sold, and that is what makes a small problem enormous.

What a batch code has to do.

Connect a unit in a customer's hand back to a production run in Indonesia, and forward from that run to every customer who received it. Both directions matter and buyers usually only build one.

It has to be readable after the goods have been handled: on the pack rather than only on the carton, since cartons get opened and discarded.

It has to be recorded at every handover. A batch code nobody wrote down at the warehouse is a batch code that stops at your door.

What to ask the factory for.

Five things, and the last one tells you whether the first four actually work.

  1. 01

    Batch coding on the primary pack

    Not only on the carton. Agree the format and where it is printed before the first run.

  2. 02

    Production records tied to the code

    Which raw material lots, which day, which line. This is what makes a recall bounded rather than total.

  3. 03

    Retained samples

    Sealed, kept by the producer, per batch. Without one, a complaint months later cannot be investigated at all.

  4. 04

    Raw material traceability

    How far back the factory can go. For smallholder crops this is genuinely hard and it is worth knowing the real answer rather than the polite one.

  5. 05

    A mock recall

    Ask whether they have run one and what it showed. A factory that has never tested its own traceability does not know whether it works.

What you have to hold.

Which batch went to which customer. This is the part that sits entirely with you and the part most importers do not have.

The documents for each consignment, filed against the batch rather than against the month.

Your own retained samples, for the same reason the factory keeps theirs.

A written procedure naming who decides, who notifies whom and in what order. Writing it during an incident is the worst possible time.

Testing it before you need it.

Pick a batch from six months ago and try to answer two questions: which raw material went into it, and which of your customers received it. Give yourself an hour.

Most importers doing this for the first time find they can answer neither, and the fix is usually a spreadsheet column rather than a system.

Do it annually. It takes an afternoon and it is the difference between a targeted withdrawal and a general one.

Questions buyers ask.

Do small importers really need this?

The obligation to withdraw unsafe product does not scale with company size in most markets. What scales is the cost of not being able to say which product is affected.

How far back should traceability go?

One step back and one step forward is the common baseline, meaning your supplier and your customer. Deeper is better and for smallholder crops it is genuinely difficult, so establish what is real rather than what is claimed.

What if the factory has no batch coding?

Then you cannot bound a recall, and that is a reason to fix it before ordering rather than a reason to walk away. Many Indonesian producers will introduce coding when a customer explains why and specifies the format.

Sourcing from Indonesia?

Tell us the product, the quantity and the destination. We come back with what it involves before anyone talks about money.

One line is enough to start. The more exact you are, the faster the answer comes back.

What you want back

Add a specification, packaging or a target price

Optional, and the fastest way for us to reply.

We answer within one working day, from Indonesia on UTC+7. Wholesale orders from $10,000 per shipment.